NLNG BONNY NIGERIA (2006-2007) The Review of all construction methods for Entrepose-Contracting project permitted to revise some installation of structural platform as PAU minimizing safety risk, with an important time saving.

Definition of the required lifting equipment, preparation of the lifting studies to final installation and execution of the lifts for three columns from 27 to 115 tons, 6 transformers 75 Tons, 2 Platforms 100 Tons suspended at 45 meters height were installed as PAU in 2 pieces each, and various other lifts for the projects.

TOTAL LA MEDE (2005) Transportation of a reactor 380 tons with an offloading in the centre of Marignane . Involved in all the project development with authorities, the entire marine transportation, loading in Italy and Offloading in France

Shah Deniz BP/ TECHNIP (2005) Preparation and transportation of elements of the TPG 500 for the BP project Shah Deniz in Azerbadjan from Singapore to Baku. Involved a Barge loading mid sea loading of heavy lift vessel, transfer to barge and vessel, river and sea towing, for elements weighing from 200 tons to 600 tons. Single point of contact with the client, responsibilities includes, contract management, engineering management, subcontractor selection and management, Operations management.

WARTSILA(2005) Survey of the road from Mombasa Kenya to Kibuye Rwanda to evaluate the possibilities of the transport of 4 engines 80 tons. A fully independent and self supported Evaluation of road and road infrastructure conditions and other obstacles on the route.

Putalam Power Plant, Indonesia WARTSILA. (2004) Warranty Surveyor for the transportation of 6 engines and generators. Heavy lift vessels offloading onto barge, roll off, land transport, skidding and jacking down of equipment onto foundation of cargo up to 300 Tons. Responsibilities include evaluation of transportation subcontractor methods and execution in a very remote location to meet with the requirements of the underwriters.

Shah Deniz BP/TECHNIP (2004)       Operations Manager For the transportation of 4 strips, part of the TPG 500 platform from Singapore to Baku ( Azerbaijan), load out onto submersible vessels, Towing into the Azov sea, Russian rivers and canal ( Don River Volga and Volga don canal) and Caspian sea. Responsible for all the operations, float on, float off, and towing operations, and negotiation and management of local subcontractors in the countries, single point of contact with the client.

Limbe Power Plant Cameroon WARTSILA/SDV (2004)    Operation Manager for the transportation of heavy cargo up to 300 tons in Cameroon, not accessible by road the equipment were first transport by barge into a nearby beach of the final plant, we were responsible for the beach infrastructures definitions, design and preparation( beach landing, access roads), and the entire transportation up to foundations, Roll on to barges, towing to location, barge beaching operation, roll off Jacking down of the equipment into foundation.

Sri Lanka WARTSILA (2004) Warranty Surveyor for the transportation of engines and generators up to 300 tons , heavy lift vessels offloading to barge and quay, Roll on Roll off, Barge towing to beaching location, Beach landing, land transport, skidding and jacking down of equipment onto foundation. Responsibilities include evaluation of transportation subcontractor methods and execution in a very remote location to meet with the requirements of the underwriters.

SNOHVIT project STATOIL/ENTREPOSE- CONTRACTING  NORWAY (2002-2003) Installation of Cryogenics tank roof structure Due to site weather constraint a specific method of installation for the tank roof was required.

Participation in the design of the tank roof to accommodate the lifting and specific installation constraint developing methods to safely transport and install the structure.

Elaboration of the transportation and installation procedure, the tender for the transportation contract, the selection of lifting equipment, management of the transportation subcontract and supervision of both transportation and installation.

SHELL Belema Gas Gathering Project in the Niger Delta Joint Venture ABB LUMMUS-GLOBAL  -  ENTREPOSE (2000-2001). Installation of 4 Gas platforms into the Niger Delta swamp made of 7 PAU. Offloading PAU’s from Heavy Lift Vessel, River transportation, preparation, management and supervision, Installation by Float Over of the PAU’s

 EGP 1 Escravos Nigeria CHEVRON Gas Plant,  Joint Venture ABB RANDALL - ENTREPOSE.

Definition of all installation methods for the Column and PAU, Selection of the Lifting Equipment.
Barge transportation of PAU from 70 tons to 400 Tons, Roll Off and Installation by crane and Skidding

 